Maintenance Work Tenders in West Bengal


As we know the maintenance is the most trustworthy and most versatile collections of user-submitted articles for reliability and maintenance professionals. Each tenders is vetted by the site’s editors for substance, accuracy, and readability. Maintenance Tenders in West Bengal archives include articles on engineering, equipment knowledge, CMMS solutions, maintenance management, scheduling and logistics, preventive maintenance, root-cause analysis, and more. 

The BJP Government has preferred to focus on PM Narendra Modi government’s Covid-19 efforts in West Bengal, to uplift the development ratio in West Bengal Region. Government of West Bengal once again made big announcements regarding the infrastructure and projects in West Bengal. During this, the government also said the important about the maintenance tenders in West Bengal.

Here, Iam providing the best Maintenance tenders in West Bengal and download the free tender notice attach in the blog.


Maintenance Work Tender in West Bengal – 1

Tendering AuthorityKolkata Metropolitan Development Authority Tenders
Tender NoKMDA/WS/GAP/SE/N/NIT-2/20-21
Tender ID2020_KMDA_299859_1
Tender BriefRejuvenation Of Existing Stop Along With Lifting Station And Pumping Station Including Sewerage Network And 5 Years Operation And Maintenance At Baidyabati And Bhadreswar Under Hooghly District In West Bengal .
LocationBaidyabati and Bhadreswar Municipal Town
StateWest Bengal
EMDINR 1756000.00 /-
Tender ValueRefer document

WORK DETAILS AS GIVEN BELOW:-

Baidyabati Municipal Town:\nType of STP – Aerated Lagoon\nCapacity of STP – 6.00 MLD\nPresent Condition – Partially Operational\nThere are 2 Nos. LS and 1 No. MPS
Cost of Survey, Process design, drawing and subsequently vetting from recognized Institution as per direction of the Engineer-in-Charge including condition assesment.\n
Reconstruction of Baffle wall (height 4.5 m) including 1 m wide walk way including side railing on both side.\n
Concrete pitching in the side slope of Lagoon (considering 2.5 m width and 75 mm thick).\n
Pathway surrounding Lagoon and Maturation Pond (considering 1 m width and 75 mm thick PCC over SBFS).\n
Concrete Pitching in the side slope of Maturation Pond(considering 2.5 m width and 75 mm thick).\n
Dismantling of existing broken RCC of Baffle wall.\n
Dismantling of existing broken masonry of Baffle wall.\n
Repairing and Renovation of Lifting Station (LS)-1 at Koyla Depot. including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilators, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
Repairing and Renovation of Lifting Station (LS)-2 at Police Phari including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilators, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Lifting Station (LS)-2 at Police Phari like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Repairing and Renovation of Main Pumping Station (MPS) at STP Site including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, screen chamber, wet well etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilators, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Main Pumping Station (MPS) at STP Site like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Operation and Maintenance of STP for 5 years including all LS, MPS, and existing sewerage network and submission of Monthly Test Reports for Influent & Effluent of STP.\n(All civil, electro-mechanical units with required repair maintenance consumable items including energy charges)\n\n
Bhadreswar Municipal Town:\type of STP – Aerated Lagoon\incapacity of STP – 7.60 MLD\present Condition – Partially Operational\there are 1 No. LS and 1 No. MPS
Cost of Survey, Process design, drawing and subsequently vetting from recognized Institution as per direction of the Engineer-in-Charge including condition assessment.\n
Repairing and Renovation of Lifting Station (LS)-1 near Shyamnagar Jute Mill including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilators, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate, etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
Repairing and Renovation of Main Pumping Station (MPS) at STP Site including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilates, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Main Pumping Station (MPS) at STP Site like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Operation and Maintenance of STP for 5 years including all LS, MPS, and existing sewerage network and submission of Monthly Test Reports for Influent & Effluent of STP.\n(All civil, electro-mechanical units with required repair maintenance consumable items including energy charges)\n\n

Maintenance Work Tender in West Bengal – 2

Tendering AuthorityKolkata Metropolitan Development Authority Tenders
Tender NoKMDA/WS/GAP/SE/N/NIT-2/20-21
Tender ID2020_KMDA_299859_3
Tender BriefRejuvenation Of Existing Stop Along With Lifting Station And Pumping Station Including Sewerage Network And 5 Years Operation And Maintenance At Uttar Para Kotrung And Konnagar Under Hooghly District In West Bengal
LocationUttarpara Kotrung and Konnagar Municipal Town
StateWest Bengal
EMDINR 3512000.00 /-

WORK DETAILS AS GIVEN BELOW:-

Uttarpara – Kotrung, Konnagar and Rishra Municipal Town:\type of STP – Waste Stabilization Pond\capacity of STP – 22.00 MLD\present Condition – Partially Operational\there are 4 Nos. LS and 1 No. MPS
Repairing and Renovation of Lifting Station (LS)-1 including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilates, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate, hand rail, stair etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Lifting Station (LS)-1 like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Repairing and Renovation of Lifting Station (LS)-2 including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilators, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate, hand rail, stair etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Lifting Station (LS)-2 like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Repairing and Renovation of Lifting Station (LS)-3 including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilates, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate, hand rail, stair etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Lifting Station (LS)-3 like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Repairing and Renovation of Lifting Station (LS)-4 including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilators, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate, hand rail, stair etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Lifting Station (LS)-4 like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Repairing and Renovation of Main pumping Station (MPS) including a) dewatering and cleaning of silt from wet well and screen chamber etc. b) repairing/renovation of slab, super structure, boundary wall, railing, screen chamber, wet well, pathway etc. c) replacement of screen d) renewing / repairing of plaster, concrete, flooring etc. e) roof treatment, f) renewing, fitting & fixing of windows, ventilators, grills etc. g) repairing / replacement of sanitary & plumbing works, h) repairing / replacement of rolling shutter, entrance gate, hand rail, stair etc. i)exterior grade acrylic primer and emulsion painting j)white washing k) painting with best quality synthetic enamel paint including primer on steel or other metal surface etc. The work should be completed in all respect as per direction of Engineer-in-Charge.\n
All electro-mechanical works of Main Pumping Station (MPS) like repair / replacement of pumps, motors, switch gear box, MB panel, clarifier, transformer, pipeline, valve, consumable items etc. as necessary for full functioning of the unit as per actual site requirement and direction of the Engineer-in-Charge.\n
Repairing and Renovation of 22 MLD STP (WSP – AP-2 nos, FP-2 nos, MP-2 nos) at Kanaipur including a) cutting & removing of jungles shrubs, plants etc., b) clearing & removing of water hyacinth from ponds, c) dewatering & desilting of ponds as required, d)fencing of STP area with fencing post & galvanized 3 ply 12 gauges / 4 points line of barbed wire in fencing, e) supplying fitting & fixing of 2 nos. MS gate (5.0 m x 2.5 m), f) surface cleaning & dressing of the ground, g) construction of main effluent channel, h) construction of peripheral channel, i)reconstruction of toe wall, reconstruction of dykes with block pitching , any protection works of dykes as necessary with brick pavement at top etc. as per instruction of Engineer-in-charge. The rates are including of all excavation works, dismantling works and safe disposal of rubbish, silts etc.\n